Design and construction of Hams Way Footbridge, Worcester

Author: Finn Graham and Ben Curry

Date published

1 June 2021

Price
Free
 
Back to Previous

Design and construction of Hams Way Footbridge, Worcester

The Structural Engineer

Author

Finn Graham and Ben Curry

Citation

The Structural Engineer, Volume 99, Issue 6, 2021, Page(s) 28-35

Date published

1 June 2021

Author

Finn Graham and Ben Curry

Citation

The Structural Engineer, Volume 99, Issue 6, 2021, Page(s) 28-35

Price

Free
 

This article describes the design of Hams Way Footbridge from concept through to construction, including an assessment of the embodied carbon.

Synopsis

Hams Way Footbridge is an elegant new pedestrian and cycle bridge on the outskirts of Worcester, UK. The steel bowstring truss bridge features smooth curves and intricate connections and is designed to catch shadow lines along its main members to enhance its lightweight appearance. This article describes the design from concept through to detailed design, including a thorough assessment of the embodied carbon.

Additional information

Format:
PDF
Pages:
28-35
Publisher:
The Institution of Structural Engineers

Tags

Bridge Bridge - pedestrian Bridge - arch Project Focus Carbon Issue 6

Related Resources & Events

Blog
Black and white portrait of a woman with curly hair, wearing a dark blazer over a light shirt.

Dr Tina Vejrum awarded the IStructE Gold Medal 2026

Dr Tina Vejrum awarded the IStructE Gold Medal 2026

The Institution of Structural Engineers (IStructE) is delighted to announce that the 2026 Gold Medal will be awarded to Dr Tina Vejrum in recognition of her outstanding contributions to complex infrastructure projects worldwide.
Date – 2 July 2026
Author – IStructE
Guidance

The operation and maintenance of bridge access gantries and runways (Second edition)

The operation and maintenance of bridge access gantries and runways (Second edition)

Guidance for bridge owners/operators, contractors, utility companies and structural designers considering the performance, function, serviceability and maintenance of new or replacement bridge access gantries.
Date – 1 October 2007
Author – Various (Institution Task Group)
Price – £34.95