In the UK, approx. 2,000 higher-risk buildings (at least seven stories/18m and containing at least two residential units) are constructed each year — in addition to the existing stock of 12,500 such buildings. In accordance with the Building Safety Act and secondary legislation, three specific stop/go decision points (‘gateways’) have been introduced:
• Gateway 1 — at the planning application stage
• Gateway 2 — before building work starts
• Gateway 3 — when building work is completed
This guidance supports suitably qualified and experienced structural engineers in the preparation of Gateways 2 and 3 submissions for HRBs. It covers submissions for both newbuild HRBs and in-scope work to existing HRBs.
*Price shown here includes pre-order discount