NOTES ON RECENT DEVELOPMENTS IN BRIDGE ENGINEERING - III
Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

NOTES ON RECENT DEVELOPMENTS IN BRIDGE ENGINEERING - III

Tag
Author
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Citation

The Structural Engineer, Volume 6, Issue 4, 1928

Date published

N/A

Citation

The Structural Engineer, Volume 6, Issue 4, 1928

Price

Standard: £10 + VAT
Members/Subscribers: Free

The Florianopolis Suspension Bridge, having a main span of 1,113 ft. 9 ins., and a
versed sine of 120 ft., in addition to being the longest suspension .span in the world with eye-bar or link chains, is also of special interest as being the first executed example of a novel type of stiffened suspension construction, by means of which greatly increased rigidity and economy of material are realised. A further departure from usual practice is the employment of rocker towers, this being the first suspension bridge in the Americas to be so built. The only large bridges previously built with hinged towers are the Elizabeth Bridge at Budapest (1903) and the suspension bridge at Cologne (1915). Still further interest attaches to the employment for the eye-bars, of high tension, heat treated carbon steel having to satisfy a specification of minimum ultimate tensile strength of 105,000 lbs. per sq. in., minimum elastic limit of 75,000 lbs. per sq. in., and minimum elongation of 5 per cent. In 18 ft., the tests being made on full-sized bars. The intended working stress in these bars is 50,000 lbs. per sq. in. Further reference will be made h the tests of this material, but it may here be noted that the average results of thirteen tests of full sized bars gave an ultimate strength of 123,000 lbs. elastic limit,, 84,500 lbs. per sq. in. and percentage elongation of 6.8 in 18 ft. The tender for the eye-bar chains in this instance reduced the total cost to the lowest estimated cost of the bridge if constructed with wire cables. Finally, a new method was employed for the erection of the eye-bar chains and stiffening girders, using an overhead trolley line, thereby eliminating falsework and working platforms. The erection occupied one year and was accomplished without loss of life.

J Husband

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 4

Related Resources & Events

The Structural Engineer
<h4>The Essentials of Reinforced Concrete Design - An Elementary Explanation from First Principles for S</h4>

The Essentials of Reinforced Concrete Design - An Elementary Explanation from First Principles for S

Case II-Resultant stress in tension over portion of section. We now come to the case in which the eccentricity is sufficient to cause at the edge of the section remote from the load point a tensile stress in excess of the direct compression stress. Ewart S. Andrews

Price – £10
The Structural Engineer
<h4>The Engineering Features of the Epsom Grand Stands:- Discussion on Mr. Cane's Paper</h4>

The Engineering Features of the Epsom Grand Stands:- Discussion on Mr. Cane's Paper

THE CHAIRMAN said the paper was a delightful record of work done and brought to a successful issue and provided an object lesson in regard to the surmounting of difficulties in the face of opposition. He himself had been responsible for the construction of a smaller building at the time of the general strike, when it was a very difficult matter to obtain steel, and one had to use just what one could get. Having regard to the fact that the amount of metal required in the construction of the Epsom Grand Stands was so enormous, the results attained were very creditable to everybody concerned. He did not know whether a time limit was imposed. The manner in which the large girders were raised was also very creditable. A girder weighing 33 tons was very difficult to manipulate, and to have raised such a girder into its position in less than 24 hours was a notable achievement. The method of using the triangular steps had also impressed him. He did not quite follow how the reinforced concrete part of the work was done, but the method adopted seemed to be an artful way of getting over the difficulties without putting a tie of reinforced concrete all the way up and having to bond it in. It was doubtful whether everybody would have thought of that method. The paper was full of “ meat,” and he was looking forward to succient criticisms of the methods of construction from the many experts whom he saw before him in the body of the hall.

Price – £10
The Structural Engineer
<h4>The Bulking and Grits of Fine Powders</h4>

The Bulking and Grits of Fine Powders

In giving a title to this paper, I have referred to the terms “bulking” and “grits,” and I think as a preliminary an explanation of my meaning is due. J.E. Worsdale

Author – Worsdale, J E
Price – £10