The Structural Design and Construction of Two Bahá'í Houses of Worship
Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

The Structural Design and Construction of Two Bahá'í Houses of Worship

Tag
Author
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Citation

The Structural Engineer, Volume 65, Issue 3, 1987

Date published

N/A

Citation

The Structural Engineer, Volume 65, Issue 3, 1987

Price

Standard: £10 + VAT
Members/Subscribers: Free

Two Houses of Worship recently constructed for the Bahá’i Faith in Western Samoa and India are examples of integration of structure and architecture.

A.R. Flint, D.I. Cooper and S. Naharoy

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 3

Related Resources & Events

The Structural Engineer
<h4>Yes - We can Hear You at the Back, Some of us Are Listening, and a Few do Care About More Than Pers</h4>

Yes - We can Hear You at the Back, Some of us Are Listening, and a Few do Care About More Than Pers

I am sorry this letter is rather long but I am not sure that, as a mere working engineer, I have the time or skill to write a short one. As a modern engineer I do of course have the ability to write a long letter when a short one would be preferable, and perhaps this is one of the problems with our profession! G.J. Austen

Price – £10
The Structural Engineer
<h4>Verulam</h4>

Verulam

Settlement and liability Responsibility in dealing with the settlement of terrace houses was first raised by Mr J. A. Tanner last July. Contributions to the discussion were received from Messrs E. J. Skilton, N. E. Hindley, and J. Pryke, in October, from Mr B. W. Totterdill in November, and from Mr R. C. Hairsine, writing on a number of subjects, in December. Another contribution has now been received from Mr G. Brandt, writing from Liverpool. Verulam

Price – £10
The Structural Engineer
<h4>The Construction Management Contract and the Role of the Engineer</h4>

The Construction Management Contract and the Role of the Engineer

We are all aware of the increase in ‘non-traditional’ forms of contract which have been introduced into the construction industry over the past 2 decades. The reasons for them initially related to the demand for rapid construction techniques to satisfy the development ‘boom’, of the 1960s. The subsequently proven unsatisfactory performance of many of the buildings constructed at that time diminished not only the reputation of the parties concerned in a particular failure, but also that of the industry as a whole. C.S. Tyler

Price – £10