N/A
Standard: £10 + VATMembers/Subscribers: Free
Members/Subscribers, log in to access
The Structural Engineer, Volume 67, Issue 1, 1989
This viewpoint arises from an open discussion which took place recently at a Committee meeting of the Lancashire & Cheshire Branch. B.P. Clancy
The paper examines theproblems of constructing a large river bank retaining wall, in a short time, under difficult tidal conditions. The site problems, alignment of the wall, structural design options considered, reasons for choosing the design solution, and the construction problems, are discussed. J. Howard, W.G. Curtin and L.S. Pope
As a result of my Chairman’s Address to the Thames Valley Branch in 1987, I have been asked to write and present the introduction to the Ordinary Meeting being held on 26 January 1989. It is intended that, following my introduction, the meeting takes the form of a general discussion, with other Part 3 examiners being present on the platform. B.W.J. Boys