Comparing CP3 and BS 6399: Part 2 - 'Division by Parts' Rule

Author: Cook, N J

Date published

N/A

First published: N/A

Price

Standard: £9 + VAT
Members/Subscribers: Free

Buy Now

Added to basket

Back to Previous

Comparing CP3 and BS 6399: Part 2 - 'Division by Parts' Rule


The Structural Engineer
Comparing CP3 and BS 6399: Part 2 - 'Division by Parts' Rule
Date published

N/A

Author

Cook, N J

Price

Standard: £9 + VAT
Members/Subscribers: Free

First published

N/A

Buy Now
Author

Cook, N J

In my first feature comparing CP32 and BS 6399: Part 23 I focused on misapplication of the CP3 rules for changes of roughness as the principal reason that BS 6399: Part 2 is erroneously perceived to give larger loads than CP3. However, there is one change between the two Codes that does tend to increase structural loads and that is the modification of the ‘division by parts’ rule - clause 5.5.2 of CP3 and clause 2.2.3.2 of BS 6399: Part 2. N.J. Cook

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Feature Issue 6

Related Resources & Events

The Structural Engineer
Legal Column. Project Documentation: Taming the Beast

Legal Column. Project Documentation: Taming the Beast

Few would dispute that construction projects generate more documents, and in particular secondary copies of documents, than are strictly necessary to get the work done. Whatever the reasons for this (and ritual abuse of the photocopier is clearly one), on completion of a project consultants need to decide how to deal with the voluminous documentation which has been generated. So what should you do? A. Rawstron

Price - £9
The Structural Engineer
The Trafford Centre, Manchester

The Trafford Centre, Manchester

The paper describes the design and construction of the Trafford Centre, a major regional shopping and leisure centre on the outskirts of Manchester. It contains 140 OOO m² of shops and related facilities set within a landscaped site adjacent to the M63 motorway. Parking for 10 000 cars is provided. The superstructure contains over 16 OOOt of structural steel. There are simply supported beam and column arrangements, with complex lateral bracing to provide free access to malls and shops. Fast-track parallel working between the client, the design team, the management contractol; and the subcontractors, is an essential feature. The ability to control and accommodate change, sometimes after the structure was complete, occurred as the design developed and tenant needs were clarified. Over 30M persons will visit the centre each year. D.A. Woodward and I.B. Povall

Author - Woodward, D A;Povall, I B
Price - £9
The Structural Engineer
Open Discussion. Lattice Shells: Recent Experiences

Open Discussion. Lattice Shells: Recent Experiences

This article reports experience on a number of lattice-shell roof structures we have designed recently. We are referring to structures where an open lattice is curved, either singly or doubly, so as to be able to carry load in a combination of in- and out-of-plane actions. Some published guidance on analysis exists, as do some reports on built projects which appear to have been determined by purely structural considerations. There is, however, little guidance on where to begin the design or, perhaps more importantly, what will constitute an acceptable end to the design of architecture-led projects. The choice of form for any structure must clearly address a number of issues to which the designer has to attach priority: - what space has to be enclosed? -how should the load be carried across that space? - the integration of technical subsystems into the structural arrangement - issues of overall economy -further issues, sometimes subsidiary, such as thermal performance, fire, acoustics, maintenance and daylighting M.W. Manning and P. Dallard

Price - £9