Behaviour of strut-waler connections with different stiffening details
Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Behaviour of strut-waler connections with different stiffening details

Tag
Author
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Citation

The Structural Engineer, Volume 84, Issue 14, 2006

Date published

N/A

Citation

The Structural Engineer, Volume 84, Issue 14, 2006

Price

Standard: £10 + VAT
Members/Subscribers: Free

Strut and waler are key components of the steel strutting system commonly found in steel temporary works for braced excavation in cut and cover tunnel, underground station and basement construction. In Singapore, the Nicoll Highway Collapse investigation has identified the stiffened strut–waler connection as a key cause of the catastrophic collapse of a section of the cut and cover tunnel construction for the Island’s Circle Line mass rapid transit system. This paper looks at the behaviour of the strut–waler connection formed typically from steel H-sections and influence of its various stiffening details. Finite element analyses of the stiffened connections comprising steel plates, channels and concrete infills are carried out, and their load resistances and post-peak behaviours are evaluated. It is concluded that conventional plate stiffeners are still the best for stiffening strut–waler connections.

S. P. Chiew, PhD, FIStructE, MIES, MASCE

Y. Yu, BEng, MEng
School of Civil and Environmental Engineering, Nanyang Technological University, Singapore

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 14

Related Resources & Events

The Structural Engineer
<h4>Verulam</h4>

Verulam

Price – £10
The Structural Engineer
<h4>Singapore New Supreme Court Building – marrying form and function</h4>

Singapore New Supreme Court Building – marrying form and function

This paper describes the design of the support structure for Singapore’s new Supreme Court Building. Most of the structure is exposed to view and this was a major driver in the adoption of precast composite steel members. Particular attention is given to fabrication and erection of the highest court house (both symbolically and physically) within a ‘disc’ set above the main building block. This disc is supported on a perimeter set of inclined columns that terminate in ball and socket joints. Dan Yap Tian Wee, BEng(Hons), MSc (Int’l Const Mgmt), PEng(Singapore) Tan Kheng Soon, BEng(Hons), MSc(Build Sci), PEng(Singapore), MACES Lai Hoke Sai, BSc (Hons), PhD, PEng(Singapore), MACES, MIES Lim Peng Hong, BEng(Civ), MSc (Civ Eng), MConcStruct DIC, PEng (Singapore), MACES, SMIES All CPG Consultants Pte. Ltd

Price – £10
The Structural Engineer
<h4>Singapore Highlights</h4>

Singapore Highlights

Price – £10