Temporary Works Toolkit. Part 15: Designing temporary works to European standards – an introduction

Author: A. Harris and M. Angelino (WSP)

Date published

1 September 2017

Price
Free
Access Resource
Back to Previous

Temporary Works Toolkit. Part 15: Designing temporary works to European standards – an introduction

The Structural Engineer
Temporary Works Toolkit. Part 15: Designing temporary works to European standards – an introduction
Date published

1 September 2017

Author

A. Harris and M. Angelino (WSP)

Price

Free

Access Resource
Author

A. Harris and M. Angelino (WSP)

Tony Harris and Mariapia Angelino of WSP explain some of the key technical issues around PAS 8812 – the new guide to temporary works design to European standards. This article aims to promote a shared understanding between designers of both permanent and temporary works.

Additional information

Format:
PDF
Pages:
4
Publisher:
The Institution of Structural Engineers

Tags

Temporary Works Toolkit Professional Guidance Issue 9

Related Resources & Events

The Structural Engineer
<h4>Business Practice Note No. 9: Ethics</h4>

Business Practice Note No. 9: Ethics

In the latest note in this series, Jane Entwistle explains what ethical standards members are expected to uphold and introduces guidance provided by the Institution on this topic.

Date - 1 September 2017
Author - J. Entwistle
Price - £9
The Structural Engineer
<h4>Beyond the limits of imagination: what do the Comet aircraft failures teach us?</h4>

Beyond the limits of imagination: what do the Comet aircraft failures teach us?

Sean Brady recounts the tale of the Comet jet airliner crashes of the 1950s and explains how the trailblazing accident investigation revealed a failure of imagination that holds lessons for all engineers.

Date - 1 September 2017
Author - S. Brady
Price - £9
The Structural Engineer
<h4>Temporary Works Toolkit. Part 2: CDM 2015 and the responsibilities of permanent works designers with</h4>

Temporary Works Toolkit. Part 2: CDM 2015 and the responsibilities of permanent works designers with

In the second part of the series, John Carpenter examines the impact of CDM 2015 and temporary works on permanent works design.

Date - 1 November 2016
Author - J. Carpenter
Price - Free