Author: IStructE
13 March 2024
IStructE
The three reports below detail the findings and sanctions issued against five members, two of which were Suspended.
The PCC found that a Graduate Member failed to respond to requests from the checking engineer; failed to demonstrate the competency required to undertake work that involved basement works with adjacent properties; failed to provide evidence of Professional...
The Disciplinary Board found that a Chartered Member failed to provide a brief or breakdown of costs before commencing work; failed to accept numerous instructions from the Owners to terminate work; made unfounded and derogatory assertions about the...
The PCC reports on three disciplinary cases
Enhance your skills with practical insights and innovative solutions in modern timber design.
Through a series of interactive online sessions supported by individual study this popular course provides a theoretical framework for understanding conceptual design in the context of structural engineering.