Back to Previous

Post-tensioned slabs in high rise buildings: design aspects

Diego Dellatorre gives an overview of design aspects associated with post-tensioned slabs in high rise buildings.

Using real-life project examples, topics covered include:

  • Floor layout
  • Restraints
  • Tendons layout
  • Modeling
  • Concrete grade
  • Design (ULS/SLS)
  • Post-formed holes

This event was organised by the UK Group of fib (The International Federation for Structural Concrete).

Speaker

Diego Dellatorre is Associate Director at WSP. He is responsible for the analysis and design of Post-Tensioned (PT) structures, PT business development and management of final PT design and detailing. 

Additional information

Format:
Video
Video Length:
00:16:05
Publisher:
IStructE

Tags

Concrete Training Video fibUK

Related Resources & Events

Guidance
Image of tall buildings in London

fibUK: tall concrete buildings

fibUK: tall concrete buildings

This fibUK lecture unveiled the processes and challenges behind designing tall buildings, focusing on foundation construction, basement design and integrating existing infrastructure at high levels.
Date – 26 June 2025
Author – Various
Training
Blue abstract blocks

fibUK: what’s happening? 2024

fibUK: what’s happening? 2024

This annual update provided an overview of the ongoing work carried out by two fibUK commissions and the fib model code.
Date – 14 March 2024
Author – Jessica Sandberg, Domenico Asprone, Stuart Matthews
Price – Free
Training
Blue abstract blocks

fibUK lecture: major infrastructure case studies

fibUK lecture: major infrastructure case studies

Date – 14 September 2023
Author – George Kapos, Henry Still, David Arribas
Price – Free