Added to basket

Taking precast concrete to the limit

Kaare K.B Dahl discusses the Bella Sky Hotel in Denmark, an elegant landmark building that exceeds the limits of how far a structure should lean.

Technical Lecture Series 2019

Vertical load bearing precast walls, hollow core slabs, and precast beams and columns make up the two 23-storey towers of the hotel.

Taking precast concrete to the limit

Additional information

Format:
Video
Video Length:
01:20:54
Publisher:
IStructE

Tags

Concrete Concrete - precast Case Study Technical Lecture Series Multi-storey - tall structure Video

Related Resources & Events

An image of a timber frame tower

Fire safety design: we need to talk about timber

Angus Law explores fire safety design of CLT (cross-laminated timber) construction and the professional obligations of engineers working on such projects.

Date - 19 July 2019
Author - Angus Law
Price - Free
Post-tensioned slabs in high rise buildings: construction aspects

Post-tensioned slabs in high rise buildings: construction aspects

Nadarajah Surendran describes construction aspects in post-tensioned slabs in high rise buildings.

Date - 26 June 2018
Price - Free
Technical Lecture Series: Knitting Bespoke Reinforcement

Knitting bespoke reinforcement for new concrete structures

The results of a research project which aimed to replace internal steel reinforcement with a knitted composite reinforcement cage made from carbon fibre.

Date - 6 March 2018
Price - Free