The Application of High Grade Steel in Reinforced Concrete
Date published

N/A

First published: N/A

Price

Standard: £9 + VAT
Members/Subscribers: Free

Buy Now

Added to basket

Back to Previous

The Application of High Grade Steel in Reinforced Concrete


The Structural Engineer
The Application of High Grade Steel in Reinforced Concrete
Date published

N/A

Price

Standard: £9 + VAT
Members/Subscribers: Free

First published

N/A

Buy Now

It is only in the last decade that progress in the manufacture of cement and the resulting improvement in the strength of concrete have been matched by a corresponding advance in the manufacture of high class steel. Oberbaurat Dr. Fritz Emperger

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 12

Related Resources & Events

The Structural Engineer
The Portland House Travelling Scholarship 1932

The Portland House Travelling Scholarship 1932

It will be recalled that Mr. Walter M. Goodesmith, Graduate, was the winner of last year's scholarship, his design for a concrete church having been published in The Structural Engineer of March, 1933 (page 127). Mr. Goodesmith has now fulfilled his obligations by presenting to the Institution the thesis embodying the results of his Continental tour, which occupied seven weeks and covered some thirty cities and towns in seven countries.

Price - £9
The Structural Engineer
Rigid Frame Bridges in Reinforced Concrete

Rigid Frame Bridges in Reinforced Concrete

Up to comparatively recent times there were three main types of bridges. 1. Arch Bridges. 2. Girder Bridges. 3. Suspension Bridges. A.P. Mason

Author - Mason, A P
Price - £9
The Structural Engineer
The Cumberland Hotel and Annexe. Discussion on Mr. Frost's Paper

The Cumberland Hotel and Annexe. Discussion on Mr. Frost's Paper

Mr. M. B. Buxton, M.C., MA., A.M.Inst.C.E. (Member), proposing a vote of thanks to Mr. Frost for his paper, said that the Curnberland Hotel and its annexe constituted one of the largest buildings ever erected in this country, and by reason of the fact that it had bedrooms and living rooms situatcti all round the building, with no external lavatories and bathrooms -a system adopted in many of the Carlatlian and American hotels-it marked a great step forward. The paper and illustrations were of extraordinary interest, for they indicated the great difficulties duo to the site, in connection with the st.celwork and retaining walls, and the special construction adopted, and they indicated how those difficulties were overcome. The Institution was very proud indeed of the fact that one of its members had been appointed engineer for this great building. One might reasonably have expected that one of the well-known civil engineering firms would have been appointed. Mr. Frost was to be congratulated on his appointment, which had done honour to the Institution, as well as to himself.

Price - £9