Construction of a Deep Basement at 105-109 Park Road, London NW8
Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Construction of a Deep Basement at 105-109 Park Road, London NW8

Tag
Author
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Citation

The Structural Engineer, Volume 78, Issue 19, 2000

Date published

N/A

Citation

The Structural Engineer, Volume 78, Issue 19, 2000

Price

Standard: £10 + VAT
Members/Subscribers: Free

The basement excavation was 43m long x 18m wide x 9m deep with lift pit to 13m. Bounded by a London Underground tunnel with sewer under, a British Rail boundary wall, a piled adjacent building, and an access close, it was constructed within temporary works with tight restrictions on movements.

S.P. Marchand

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 19

Related Resources & Events

The Structural Engineer
<h4>Verulam</h4>

Verulam

Column or Beam Jack Kavanagh has written from Co. Kildare in Ireland: I write to try to clarify a difference in interpretation among some colleagues regarding design of cantilever columns. A lot of industrial warehousing here is constructed in precast concrete frames using fixed-base cantilever columns. BS 8110, section 3.8.4.1, states that columns design assumptions are as for beams (section 3.4.4.1).

Price – £10
The Structural Engineer
<h4>The Role of the Planning Supervisor</h4>

The Role of the Planning Supervisor

Who can be a planning supervisor? The Construction (Design & Management) Regulations, 1994, place no restrictions on who may be appointed as a planning supervisor, provided they are competent to perform that function in relation to a particular project; indeed, the client may carry out the duties himiherself, provided that the person appointed has the necessary competence. However, the risk of sacrificing the objectivity that an independent planning supervisor brings to a project should not be overlooked.

Price – £10
The Structural Engineer
<h4>The Design of Westminster Station (Jubilee Line Extension)</h4>

The Design of Westminster Station (Jubilee Line Extension)

The design and construction of Westminster Station on the London Underground Jubilee Line project was both technically demanding and a complex undertaking. This paper is concerned with the design but not the construction. It sets out to describe the many and varied constraints imposed by the selected site,adjacent buildings and structures designed and built by others over the station whilst it was under construction. R. Hankin

Author – Hankin, R
Price – £10