Construction and design of a 50m single span uhp ductile concrete composite road bridge
Date published

N/A

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

Back to Previous

Construction and design of a 50m single span uhp ductile concrete composite road bridge

The Structural Engineer

Citation

The Structural Engineer, Volume 89, Issue 15, 2011

Date published

N/A

Citation

The Structural Engineer, Volume 89, Issue 15, 2011

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

A single span 50m long prestressed road bridge has been fabricated under a Public Works Department contract in the State of Negeri Sembilan, Malaysia. The bridge, across a river, was constructed at the small village of Kampung Linsum, Sungai Linggi. To date, this bridge is the first in Malaysia and may also be the world's longest composite road bridge made from ultra-high performance ductile concrete (UHPdC). This paper presents the features of the UHPdC precast girder; gives a brief insight into the manufacturing process of the girder; highlights the bridge's construction sequence; illustrates the design method and provides an environmental impact calculation. The midspan deflections of the bridge at different times in its construction history were compared against the collected field data and these figures showed that the calculated values were in general in agreement with the field data.

Yen Lei Voo, BE, PhD
Dura Technology Sdn Bhd

Patrick C. Augustin, FIEM, PEng, FICE, CEng, FIStructE
Perunding FAISAL, ABRAHAM dan AUGUSTIN Sdn Bhd Consultants to Dura Technology Sdn Bhd

Thomas A. J. Thamboe, ANS, PMC, PJK, MIEM
Endeavour Consult Sdn Bhd for Public Works Department, Negeri Sembilan, Malaysia

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Concrete Bridge Project Focus Issue 15/16

Related Resources & Events

The Structural Engineer
Preparatory works for demolition of Huntingdon Railway Viaduct

Decommissioning of the A14 Huntingdon Railway Viaduct, Cambridgeshire

Decommissioning of the A14 Huntingdon Railway Viaduct, Cambridgeshire

This paper describes the demolition of the central suspended span of the Huntingdon Railway Viaduct, which crosses the East Coast Main Line on the west side of the Cambridgeshire town.
Date – 4 January 2022
Author – Colin George, Mark Hatcher, Chris Law, Ionut Paunescu
Price – £9.95
The Structural Engineer

Design and construction of Hams Way Footbridge, Worcester

Design and construction of Hams Way Footbridge, Worcester

This article describes the design of Hams Way Footbridge from concept through to construction, including an assessment of the embodied carbon.
Date – 1 June 2021
Author – Finn Graham and Ben Curry
Price – £0
The Structural Engineer

The 'Go Between Bridge', Brisbane, Australia

The 'Go Between Bridge', Brisbane, Australia

Jo' Kenward and Craig Mills describe the design, scoping and construction of the 'Go Between Bridge' in Brisbane, Australia, part of the Hale Street Link project.
Date – 1 March 2011
Author – Jo' Kenward and Craig Mills
Price – £9.95