The Metric Panel, B/-/9, is keeping a general watching brief on progress in the construction industry as a whole, so as to act as BSI agent for monitoring and regulating the programme for the metrication of standards and Codes of Practice to ensure that the requirements of PD 6030 are met.

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 2

Related Resources & Events

The Structural Engineer

The Policy of Construction

The Policy of Construction

The Ordinary Meeting of the Institution at 6 pm on Thursday 12 February 1970 is to be a Joint Meeting with the British Section of the Societe des lngenieurs Civils de France. A number of French guest speakers have been invited, including M. Yves Saillard, the Technical Director of the Syndicat National du Beton Arme et des Techniques Industrialisees.
Author – Evans, R H;Khalil, M G A
Price – £9.95
The Structural Engineer

The Behaviour and Strength of Prestressed Concrete and Rectangular Beams Subjected to Combined Bendi

The Behaviour and Strength of Prestressed Concrete and Rectangular Beams Subjected to Combined Bendi

A series of uniformly and eccentrically prestressed concrete beams was tested in combined bending and torsion, with ratios of bending moment to twisting moment varying from pure bending to pure torsion. In all, twenty-three prestressed beams and two plain concrete beams were tested. The deflections and strains due to bending and torsion were measured at selected points. Professor R.H. Evans and M.G.A. Kahalil
Author – Evans, R H;Khalil, M G A
Price – £9.95
The Structural Engineer

Tension Structures

Tension Structures

The paper describes different types of tension roofs and methods by which they can be analysed. The theories consider prestressed cable roofs as discrete systems having significant geometrical displacements. H.A. Buchholdt